Project Scope

Graycor installed two General Electric 80-megawatt 7-E gas combustion turbine generators (Nos. 4 and 5). The team was responsible for the equipment installation and alignment, inlet and exhaust ductwork, auxiliary pumps and process skids. Graycor also managed the heavy equipment rigging, piping, fire protection and ventilation systems.