Glendale, Arizona

G303 Phase I

Client / Owner

Hines

Architect / Engineer

Ware Malcomb

Market

Logistics + Distribution

Company

Graycor Construction

Project Scope

Graycor served as the general contractor for this 570,000 SF concrete tilt-up building with 40’ clear height ceilings, a panelized roof structure, and a cross dock. G303 features 60-foot speed bays, abundant dock-high loading doors and highly functional footprints. It has a sleek exterior design, with the ability to accommodate more than 550 cars and 80 dock positions. The project also includes a basketball court amenity for employees to enjoy during break times.

Work on the 79-acre site included public road improvements, public infrastructure, utilities, a truck court, parking, roadways, utilities and landscape. Since the project is located near Luke Airforce Base, Graycor coordinated with the base and the FAA to ensure that construction didn’t interfere with their operations.

G303 Phase II – MLILY Shell

Glendale, Arizona

Ten Distribution Center Phase I

Phoenix, Arizona

Metro East Valley Commerce Center – Phase II

Mesa, Arizona