Wisconsin Electric Power dry cask storage

Wisconsin Electric Power dry cask storage
Wisconsin Electric Two Rivers dry cask storage
Wisconsin Electric Two Rivers dry cask storage
Wisconsin Electric Two Rivers dry cask storage
Wisconsin Electric Two Rivers dry cask storage
Wisconsin Electric Two Rivers dry cask storage
Wisconsin Electric Two Rivers dry cask storage
Client: 
Wisconsin Electric Power Co.
Architect/Engineer: 
Dames and Moore
Project scope: 
Graycor Industrial completed the construction of a dry cask storage system for Wisconsin Electric at the power producer's Two Rivers, Wisconsin, plant. Scope of work included construction of eight new ventilated concrete storage casks (each 11 foot by 18 foot), two large storage pads, perimeter fencing and a pre-engineered building with foundations. In addition, the Graycor Industrial team completed all site and road work involved in the project.