Substation
Louisville Gas and Electric Substation
Client:
E.ON U.S. LLCArchitect/Engineer:
Sargent & LundyProject scope:
Graycor Industrial was contracted to construct an enclosed 138kv–13.8V substation — housing for an electrical transmission and distribution center — in downtown Louisville.
Building the new substation called for demolition of the previous facility, located on the future site of a multi–purpose arena. The project included site work, CIP concrete structure, PVC roofing, interior masonry, HVAC, plumbing and electrical.
Categories: New generation | Transmission and distribution | Graycor Industrial | Power | Kentucky | South | Construction | HVAC
Browse projects by:
-
Graycor Industrial
- Metals
-
Power
- Air quality and environmental
- Balance of plant
- New generation
- Nuclear
- Transmission and distribution
-
Graycor Construction
- Hospitality
-
Nitti Graycor
- Nitti Graycor Assisted Living
- Nitti Graycor Corporate Facilities
- Nitti Graycor Distribution and Logistics
- Nitti Graycor Healthcare
- Nitti Graycor Hospitality
- Nitti Graycor Manufacturing
- Nitti Graycor Retail







