Fire Main Replacement
Dresden Station Fire Main Replacement
Client:
Dresden Generating StationProject scope:
This project included excavation, removal and replacement of existing 12-inch fire main encircling the turbine building inside of the protected area. Before beginning the project, the Graycor Industrial team probed for locating existing underground utilities. Fine excavation was completed using high-volume vacuum trucks.Browse projects by:
-