Environmental Retrofit
AEP Environmental Retrofit
Client:
American Electric PowerArchitect/Engineer:
Black & VeatchProject scope:
This two–phased project involved installing flue–gas desulfurization (FGD) and selective catalytic reduction (SCR) systems to reduce sulfur dioxide and nitrogen oxide emissions from the plant′s Unit No. 4. Phase one of the project consisted of substructure work, including foundations, underground utilities, roadways, site grading and surfacing. Phase two involved all superstructures supporting the FGD and SCR systems, as well as all associated equipment and buildings.
Browse projects by:
-
Graycor Industrial
- Metals
-
Power
- Air quality and environmental
- Balance of plant
- New generation
- Nuclear
- Transmission and distribution
-
Graycor Construction
- Hospitality
-
Nitti Graycor
- Nitti Graycor Assisted Living
- Nitti Graycor Corporate Facilities
- Nitti Graycor Distribution and Logistics
- Nitti Graycor Healthcare
- Nitti Graycor Hospitality
- Nitti Graycor Manufacturing
- Nitti Graycor Retail







