Boiler System Replacement

Dresden Station Control Room - Steam Boiler System Replacement
Dresden Station control room
Dresden Station control room
Dresden Station control room
Client: 
Dresden Generating Station
Project scope: 
Graycor Industrial replaced two 40,000-lb./hr heating boilers inside the Dresden Station protected area. Scope of work for this project also included all boiler and related equipment installation, a new stack, and auxiliary work. All work peformed for this project required "hot area" precautions.