ArcLight Cinemas Boston

Boston, Mass.

Client / Owner
ArcLight Cinemas
Architect / Engineer
Hollis and Miller Architects | Shook Kelley
Market
Entertainment
Company
Graycor Construction
Location
42.367378,-71.062614

Project Scope

Graycor Construction is currently providing general contractor services for the interior build-out of the new ArcLight theatre in Boston, which will be the region’s first ArcLight theatre.

The 70,187-square-foot, 15-screen theatre will be located on three floors of The Hub on Causeway, a new 1.75 million-square-foot development, and include a full bar, café and concessions with a full range of food and drink options including customer favorites such as ArcLight’s famous caramel popcorn and chicken sausage baguettes.

Auditoriums will feature extra-wide reserved seating, top-quality projection and sound, and each screen will be equipped with adjustable masking, so that whatever aspect ratio a movie is shot in, there won’t be unused gray space at the top, bottom, or sides of the screen.