As technological capabilities increase worldwide, so do the complexities of constructing and maintaining manufacturing facilities. Graycor Construction has been innovating better, more effective, more efficient processes for closing this gap for more than 50 years.

Extensive experience preplanning, coordinating, scheduling and problem solving allows us to reduce costs, workload and timelines on a variety of projects, large and small. And that's not all. As the industrial side of Graycor's commercial division, we hold ourselves to the relentless ISO 9000 system of quality and bear a range of self-performance capabilities. It's how we deliver unparalleled performance for your most demanding projects.

For more information about Manufacturing Construction, contact Area Operations Manager, Scott Skala, at scott_skala@graycor.com or 704.817.6256.

GCC Manufacturing Brochure Cover

Manufacturing Brochure

 

 

 

 


Projects

  • Polyplex Corporation Ltd., the fourth largest producer of thin polyester film, hired Graycor Construction Company as the construction manager for their first North American facility located in Decatur, Alabama.

  • Graycor Construction completed a plant expansion at the 80 acre Navistar campus in Melrose Park, IL. Improvements include a dedicated truck development tech center with testing facilities, a new entrance and more.

  • Graycor Construction completed work for Volkswagen Group of America Chattanooga Operations, LLC for construction of the assembly and body shops, technical center and social area for Volkswagen's new plant in Chattanooga. The social area houses plant-related administrative functions. Graycor Construction sourced more than 60 percent of the contract to local contractors. Graycor Construction also …

  • Graycor Construction completed construction for Toyota's new vehicle assembly plant built on 1,700 acres in Blue Springs, Miss. (near Tupelo). The environmentally sensitive project, for which recycled materials were used in the construction, was completed by Graycor Harrell, a joint venture partnership between Graycor Construction Co. Inc and Jackson, Miss.-based Harrell Contracting Group, LLC.

  • The projects, which included a contract for the paint/general stores and a contract for the utilities building, were performed by Graycor Byrne, a joint venture between Graycor Industrial Constructors Inc. and Dallas, TX-based Thos. S. Byrne Ltd. Work for both contracts  included the structural steel packages, all mechanical and electrical work, enclosures (including metal siding …

  • Electrolux has established themselves as the world′s largest producer of appliances and equipment for kitchen, cleaning and outdoor use. And when they wanted to take  their business into new territory, they looked to a construction partner they could trust. Graycor International  was brought on to build a new 1.7 million-square-foot refrigerator manufacturing facility in…

  • This joint venture was established to build medium commercial trucks to be marketed independently under the Ford and Navistar International® brands. The trucks are produced at International Truck and Engine Corporation′s assembly plant in Escobedo, Nuevo León, Mexico. The program integrated modifications, retooling and expansions to the plant′s body shop, paint shop and …

  • Graycor managed construction of Toyota Motor Manufacturing′s expansive new Tecate plant in four specific phases. Phase one included excavating and embanking 2.7 million cubic meters of earthwork. In phase two, Graycor constructed a 400,000-square-foot manufacturing building, wastewater treatment plant and substation. Phase three included construction of a 50,000-square-foot e…

  • This 410,000-square-foot production, distribution and office facility for Motorola met initial occupancy just 14 months after groundbreaking. Motorola′s smooth, multiphase move-in was all the more remarkable because the fast-track schedule required construction to proceed parallel to design development. The project began with the removal of approximately 100,000 cubic yards of materials from the…

  • Nitti Graycor was called upon to perform construction of a 315,000-square-foot facility on approximately 19 acres.

  • Graycor Construction completed work at the Louis Rich Turkey-Processing Facility in Missouri. Prior to Graycor mobilizing its team, rough grading and erection of a pre-engineered 436,000-square-foot building took place. Interior construction of the site covered a 10-acre area within a building shell situated on a 60-acre site. In total, the project included site work (paving, finish grading, sew…

  • Graycor completed the Everest Building Project-a 304,000-square-foot building addition to Carrier Corp.'s Memphis-area manufacturing plant. The year-long project expanded the manufacturer's ability to produce heating and air units.

    The plant remained fully operational throughout the project, which required close coordination and open communication with the entire crew as well as plant employe…