Hotels

Renovating a 100-year-old
lobby or building a new 200-room hotel requires the same exacting
attention to detail. Graycor Construction manages projects from
preconstruction to completion throughout the country. And we do it
all with the same quality and service you give to your
customers.
In new construction, our professionals are experienced in a
full range of materials, means and methods. Whether a project is
wood-framed, steel- framed, cast-in-place concrete or
block-and-plank, we have the expertise to price and execute work
with the highest standards.
And when it comes to renovations, we bring extensive
experience in both room and common areas, as well as historic and
modern restoration environments.
Projects
-
Graycor Construction Company Inc., completed the rebuild/remodel of the main lodge and ballroom at Camelback Inn, a JW Marriott Resort & Spa in Scottsdale, Ariz. Reported to be one of Mr. Marriott's favorite resorts, Camelback sits on a 100-plus acre site featuring 36 holes of championship Arizona golf, a signature spa and lavish meeting space for conferences and events. Graycor Constr…
-
Our long-term relationship with Marriott has led to the construction and renovation of hotels coast to coast. Most recently, a 57,000-square-foot addition to the existing ballroom and food service support-area renovations was completed at the Marriott in Anaheim, CA. This 19-story, 1,031-room hotel is located just two blocks from Disneyland.
-
For Washington, D.C.-based Marriott, we completed guest-room and corridor-renovation work at the Marriott San Francisco hotel. Working while the hotel remained in operation, our team renovated 1,453 guest rooms and corridors from levels five through 38. Overall, the phased renovation involved refurbishment of more than 100 different room types and the installation of upd…
-
Graycor Construction was called upon to renovate four meeting rooms and a corridor at the Scottsdale Marriott Suites Old Town hotel located in downtown Scottsdale, Arizona. The renovation consisted of a complete demolition and new installation of the carpet, wall covering, paint, finishes and furniture. The team worked closely with the hotel operations staff to coordinate the new construct…
-
In six short weeks, Graycor Construction crews completed renovation of an existing 17,000-square-foot ballroom for Marriott International in Santa Clara, CA. Renovated areas included nine dividable ballrooms and a pre-function area. In addition, the Graycor Construction team renovated the ballroom′s restroom facilities.
-
The complete retrofit of this 127,000-square-foot, 11-story hotel included adding exterior enhancements, as well as demolishing and rebuilding all main interior areas.
-
The complete remodel of this 250,000-square-foot, seven-story hotel included a facade, curtain wall, guest rooms (finishes and mechanicals), a restaurant, meeting rooms, a grand lobby and a new pool-building addition.
-
Graycor was hired to perform major renovations to the Marriott Minneapolis hotel, including 584 guest rooms and corridors. To meet the aggressive schedule and avoid interrupting the hotels operations, Graycor′s team renovated and turned over one floor at a time.
-
Graycor Construction completed a number of major renovation projects at The Columbus, a Renaissance Hotel, in Columbus, OH. The projects entailed renovating 400 guest rooms, suites, corridors and the concierge lounge, as well as renovating the lobby and restaurant. The hotel, located in the heart of the city′s downtown, remained operational throughout the entire project.
-
The Graycor Construction team completed the renovation of 286 guest rooms and 11 suites at the famed Westin Hotel on Chicago′s Michigan Avenue. Operations during the three-month construction project took place under a tight, around-the-clock schedule while the hotel was occupied and fully operative. Continuous attention was required to control noise and dust for the comfort o…
-
The Graycor Construction team renovated the 47-story Atlanta Marriott Marquis in Atlanta, GA. Work on the downtown premier hotel included renovating concierge level rooms and suites, as well as 1,660 guest rooms and 46 corridors. The team supervised the more than 170 tradesmen required to complete the job on time without disrupting the hotel′s guests. Shortly follo…
-
Graycor Construction performed a 400-guest room renovation of the Cleveland Marriott Downtown at Key Center. Work on the guest rooms, suites and ADA room conversions included demolition, electrical, plumbing, mechanical, drywall and finishes. The hotel remained in operation throughout the entire project.
-
Graycor Construction completed a guest room and suite renovation at the Marriott Atlanta Airport hotel in Atlanta, GA. The project involved renovation of 649 standard guest rooms and corridors, in addition to six hospitality suites. The scope also included a complete four-pipe fan coil replacement.
-
Marriott chose Graycor Construction to renovate 362 guest rooms of the Four Seasons Hotel in Philadelphia, PA. Work included selective demolition and electrical reworking; installing new wall coverings and painting; new carpeting and ceramic flooring; new doors and hardware; plumbing; and new finish trim work. The renovation also included adding ADA rooms.
-
Graycor Construction built this elegant Four Seasons luxury hotel in the 900 North Michigan building, a 66-story, multi-use complex on Chicago′s Magnificent Mile. The five-star hotel with 362 guest rooms is nestled on 17 floors of this 2.7 million-square-foot Chicago landmark.
-
Ritz-Carlton called on Graycor for the public space renovation to their five-diamond Buckhead Hotel in Atlanta, Georgia.