Skip to content. Skip to navigation
Graycor Industrial Constructors >> Power >> Balance of Plant Work >>

Midwest Generation - #9 Dust Collection Upgrade

Joliet, Illinois

Owner / Client
Midwest Generation EME, LLC

Emergency response services were required to return a railcar dumper to its center position, set the car back on its rails until temporary rails could be installed. The dumper was righted, all severely damage structural repairs and replacement of cables and alignment were made operational.

Graycor mobilized in less than 24 hours after receiving authorization from Midwest Generation to proceed. The dumper was operational 15 days after the incident with some aspects of it operating better than before. The work was especially challenging because the dumper contained a railcar at the time, which created a dangerous situation in the way the equipment was positioned while Graycor was raising and setting it. The project was completed without any safety incidents.



Your Location:
Graycor Industrial Constructors>> Power>> Balance of Plant Work>> Midwest Generation - #9 Dust Collection Upgrade
One Graycor Drive
Homewood, IL  60430
T 708 206 0500
F 708 206 0505
E info@graycor.com
 
 
Copyright © 2006
Graycor Inc.
All Rights Reserved
Graycor Companies

Graycor Industrial Constructors

Graycor Construction Company

Graycor Blasting Company Inc.

Graycor International

About Us
Companies
Safety
Quality
News
Projects Awarded
Careers
Contact Us
Home
 
 
Midwest Generation - #9 Dust Collection Upgrade
 
 
Markets
 
Projects